Zarichanska st. 13, Khmelnytskyi, Ukraine
Mon - Fri 10:00 - 18:00

PRICING

FORMING THE PROJECT COST

SERVICE PACKAGES

Any design project is divided into three parts - schematic, visual, and economic. We either remove one of these parts in the service package or work on it in more detail. The most optimal option is a full design project, but as you can see, the content can vary.

TECHNICAL DESIGN PROJECT

TIMELINE: 2 WEEKS/50m²

250/m²

on-site visitdrafting the measurement plandevelopment of furniture layout optionselectrical wiring plan (sockets, switches, lighting)plumbing layout plan
VISUAL DESIGN PROJECT

TIMELINE: 1 MONTH/50m²

450/m²

on-site visitdrafting the measurement plandevelopment of furniture layout optionsnetwork layout plan (electricity, plumbing, demolition works)creation of photorealistic interior visualizationsselection of materials, furniture, and equipment1-3 site visits
BUSINESS DESIGN PROJECT

TIMELINE: 14 DAYS/50m²

450/m²

on-site visitdrafting the measurement plandevelopment of furniture layout optionsnetwork layout plan (electricity, plumbing, installation, complex node layouts)creation of photorealistic interior visualizationsselection of materials, furniture, and equipment1-3 site visitsassistance with the selection and purchase of materials
TURNKEY PROJECT

TIMELINE: UP TO 6 MONTHS

1000/m²

development of a complete design projectselection of contractors, choosing from 4 proven teamsselection of finishing materials and their analogues directly in stores, working with managerscontrol of construction stages, resolution of problematic situationsselection of furniture, plumbing, and textilesphoto report every three days during construction
FULL DESIGN PROJECT

TIMELINE: 2 MONTHS/50m²

700/m²

on-site visitdrafting the measurement plandevelopment of furniture layout optionspackage of plans for construction workswall layouts (detailed drawings)dimensional drawings of custom furniture (kitchen, wardrobe, etc.)creation of photorealistic interior visualizationsselection of materials, furniture, and equipment1-3 site visitsoffline selection of materials in stores (up to 3 visits)
LANDSCAPE DESIGN

TIMELINE: 1 MONTH

3000/Ar

development of the master plan of the siteplan of surface types and placement of road-path networksdendrological planplanting drawingssite lighting schemeproposals for small architectural forms (gazebos, extensions, etc.)visualizationvideo tour up to 1 minutecost calculation from partners